EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Utah-Jay
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (285)
Boot Cowl
- (17)
Workshop
- (1)
Empennage
- (2)
Fuselage
- (69)
Firewall
- (4)
Tail Feathers
- (9)
Wings
- (9)
Controls
- (17)
Avionics
- (35)
-
Fixed a faulty Carb...
-
ELT Gremlin fixed
-
Radio PTT
-
Fired Up the Panel
-
Clean up and protect...
-
Added Alternator...
-
Ignition Key Power
-
Alternate USB Plugs
-
Alternator / Voltage...
-
Wire Routing/Planning
-
Electrical Cables
-
Ground Bus
-
Wiring Day, hooking...
-
Terminated coaxial...
-
Finished AP Servo...
-
Installed Connectors...
-
PPT and AP Harness
-
Engine Monitors and...
-
More Wiring
-
Wiring
-
Wire routing
-
Nutplates and trays
-
Avionics Trays
-
Trimmed Avionics Tray
-
Wire conduit and...
-
Avionics Box Trays
-
Installed the Panel
-
Wire retention and...
-
ADAHARS Tray
-
Antenna trays
-
GPS and Comm antenna...
-
Static Port tubing
-
Static Port location...
-
Installed the Static...
-
ELT Mount
Lighting
- (3)
Instrument Panel
- (2)
Landing Gear
- (16)
Engine
- (30)
Propeller
- (1)
Fuel System
- (8)
Interior Finish
- (8)
Paint / Decals
- (8)
Inspection
Tools
- (1)
Engine Cowl
- (31)
Doors
- (1)
Baffling
- (12)
Cabin Air
- (1)
Builder Name:
JAY TOWNSEND
-
Project:
Companion
-
VIEW REPORTS
Total Hours:
1317.5
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Oct 21, 2021 - No Finish Date
Engine:
Barrow Lycoming O-360
Propeller:
Sensenich 82” GA
Panel:
Dynon
Friendly URL:
https://eaabuilderslog.org?s=Utah-Jay
Home or Last Project Picture
Dec 13, 2022
Nutplates and trays
- (5 hours)
Category: Avionics
Fitted boxes on the top and the ACM on the bottom. I used 1” nylon spacers on the bottom to give relief from bolt heads and the fuselage tubing for the ACM. Everything is still loose fit in regard to the bolts as there will be more on and off to cut holes in the tray for wires to pass through and install grommets
95023C68-8836-4946-8065-4475AE9D2BB3.jpeg
41881FFD-6BC5-4425-9B18-F211956CB8D1.jpeg
4DC911FF-F474-4DCF-91DD-15CE0751DABD.jpeg
023940C0-8297-4155-B3E3-8DD4C07CB015.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.